Management liability is written on a claims-made basis, and two dates decide what the policy will answer for: when a claim is made, and the prior-and-pending litigation date before which known matters are excluded. Keep the date from year to year and the client keeps its continuity. Reset it to inception and every matter that began before the reset can fall outside the cover.

On this illustrative renewal the binder kept the prior-and-pending date at March 1, 2019. The issued policy says November 1, 2026 — the inception date. One line on page two. The healthcare group, the carrier and every figure are invented Illustrative.

Use case card
InsuredMarrowfield Health Partners, Inc. — a private healthcare group (illustrative)
LineDirectors and officers / management liability, renewal
DocumentsExpiring policy, quote, binder, issued policy
What it finds43 checks: 42 match, 1 fails — the prior-or-pending litigation date; 4 renewal changes, 2 narrower (the date, and the Side C retention $100,000 → $150,000)
Agents involvedCoverage extraction, proofing checker, renewal comparison, forms, supervisor, discrepancy drafter
DecisionsRaise the failure with the carrier; practice leader sign-off on the blocking control
OutcomeA correction request asking for the 2019 date as bound; the delivery summary will name the higher retention

Why a date is checked as high severity

In the coverage taxonomy each field carries a severity and a direction. For dates that define the claims-made cover, earlier is broader: an earlier prior-and-pending date leaves fewer matters excluded. A later one narrows cover, and a mismatch against the binder is a high-severity failure.

flowchart LR A["Expiring
P&P date 2019-03-01"] --> B["Quote
2019-03-01"] --> C["Binder
2019-03-01"] --> D["Policy
2026-11-01"] D --> E{"Proof: policy
vs binder"} E -->|"differs"| F["Fail · high
cited p.2 / p.2"] D --> G{"Compare: vs
expiring"} G -->|"later"| H["Narrower · high"] style F fill:#ffe4ea,stroke:#e3405f style H fill:#ffe4ea,stroke:#e3405f

Step by step

Marrowfield Health Partners, D&O renewal The policy arrived a few days before inception. Illustrative.
1
Readextraction_agentCheck

The D&O taxonomy: aggregate limit, Side A limit, retentions by side, the prior-or-pending date, premium, forms including an entity antitrust coverage endorsement with its own sublimit.

2
Proofedproofing_agentCheck

One failure: prior-or-pending litigation date March 1, 2019 on the binder, November 1, 2026 on the policy.

3
Comparedcomparison_agentCheck

Premium $66,200 → $74,800 (+13%); Side C retention $100,000 → $150,000 (narrower, agreed at quote and binder); the prior-or-pending date (narrower, on the policy only).

4
Formsforms_agentCheck

Eight form and exclusion checks; nothing to look at. The professional services exclusion with its carve-back was on the binder too.

5
Controlssupervisor_agentCheck

Delivery blocked by the unresolved high-severity failure; the narrowing must be named. A practice leader sign-off is prepared.

6
RaisedAccount managerSame day

Raises the date with the carrier. The request cites the binder’s page 2 and the policy’s page 2.

7
DeliveredAccount executiveLater

Once the corrected date is endorsed and re-proofed, signs a summary that names the higher Side C retention in plain words.

What the screens show

Proofing · D&O
The Proofing zone on an illustrative D&O renewal
Proofing on a management liability renewal: the prior-or-pending litigation date is March 1, 2019 on the binder and November 1, 2026 on the policy.
Comparison · D&O
The Comparison zone on an illustrative D&O renewal
Comparison on the D&O renewal: premium up 13%, the Side C retention from $100,000 to $150,000 and the prior-or-pending date moved on the policy.

Note what the comparison does with the retention: it was agreed at quote and bound, so it is not a proofing failure, but it is a narrowing against the expiring and the client must be told. The date, by contrast, is both.

What the agents prepared

AgentWhat it preparedWhat it citesWho decides
Proofing checkerRaise 1 failed check with the carrierBinder p.2, policy p.2Account manager
SupervisorPractice leader sign-off: 1 control firedThe unresolved high-severity failurePractice leader
Renewal comparison4 changes, 2 narrowerExpiring, quote, binder, policy— (findings)
SectionHitOutcome
Proofing controlA high-severity check failed and is unresolvedblock
Proofing controlCover narrowed at renewal (2 changes)warn
Proofing controlPremium up more than 25% (+13%)pass

For the account team

A one-line date difference arrives as a high-severity failure with both pages, not as something to spot on a re-read.

For broker IT

Direction is a property of the canonical field; the same rule reads every carrier’s wording of the date.

For practice leadership

Continuity of claims-made cover is a classic E&O claim against a broker. The record shows it was caught and asked for.

Questions we get asked

What if the carrier insists the date resets?

Then it is a negotiation, and a decision for the account executive and the client. Waiving a high-severity failure requires a reason and refers the check to a practice leader.